Quality & inspection — CMM, FAI, CoC and ISIR auto-generated.
Best-in-class CMM, height gauges, optical comparator, vision, surface, and hardness testing. First Article Inspection per AS9102. CoC and ISIR generated automatically by K+G Ai ERP — every shipment, every time, no chasing paperwork.
AI-planned inspection, human-verified.
Inspection used to be the bottleneck — a binder of forms, a CMM operator chasing balloons, paperwork arriving days after the parts. K+G's AI Inspection Planner reads the drawing, balloons it, generates the CMM routine, and produces CoC + ISIR automatically. Per-shipment inspection paperwork dropped from 11 hours to 14 minutes.
CMM & 3D probing
Best-in-class CMM cells with touch-probe and scanning-probe heads. Routines generated from AI-ballooned drawings. Reports CSV-exportable for customer SPC programs.
First Article Inspection (AS9102)
Form 1, 2, 3 generated automatically from the ballooned drawing + measurement data. Customer-supplied AS9102 templates accepted. Same process whether the part runs 1 piece or 50,000.
Auxiliary testing
Vision systems for small features. Surface roughness (profilometer). Hardness (Rockwell, Brinell). Cert package emailed with shipment notice.
Every job, every shipment.
Inspection isn't a separate department — it's the last gate before shipping. The platform enforces it.
CNC milling
In-process inspection between roughing & finishing for tight-tolerance work.
/ CapabilityCNC turning
Bar-work first-piece + every-nth checks on volume runs.
/ CertificationAS9100D
Aerospace quality system that drives our entire inspection process.
/ IndustryAerospace
Where AS9102 FAI is non-negotiable. Every flight-critical part inspected to print.
Inspection & metrology questions, answered.
What CMM equipment do you use?
Best-in-class CMM with touch-probe and scanning-probe heads. Routines generated from AI-ballooned drawings. Reports CSV-exportable for customer SPC programs.
Do you do AS9102 First Article Inspection?
Yes — Form 1, 2, and 3 generated automatically from the ballooned drawing + measurement data. Customer-supplied AS9102 templates accepted.
How do you generate CoCs?
Certificates of Conformance generate from the same database that ran the job — measurement data, lot codes, material certs, and traceability chain all link automatically. No transcription, no paperwork chase.
Can you do customer-specific SPC reporting?
Yes. CMM data exports as CSV/Excel for upload into customer SPC systems. Pre-built templates for the major OEMs (Boeing, Lockheed, GE Aviation, Raytheon).
Turnaround on first-article work?
Quote in 24 hours. FAI typically adds 1–2 days to the production schedule depending on complexity. We don't ship before the FAI clears.
Send the print. Quote includes inspection cost.
Quote includes the inspection package the print calls out. PDF + STEP is ideal.